Frame 1 · The trap
We did everything. But is it working?
Training delivered, messages sent, manuals distributed. Those are activities, not evidence. "200 people trained" says nothing about whether it works.
Not waiting until the end to see whether it worked. Instead: making the steps along the way measurable. Knowing at any moment whether you are on the right track, and adjusting when you are not. That is evidence-based change.
Most changes measure at the end: did it work? By then adjusting is no longer possible. The question is not only what you measure (the success criteriasettled that), but when you measure and what you expect to see at each point along the way. Which steps do you make measurable? What is the signal that you are on course? And what do you do when that signal is missing?
At every level you ask the question: what do I expect to see here at this moment? Activity: did we do what we planned? Adoption: are people really doing it? Outcome: is it producing the results we expected? Benefit: does it contribute to the goals of the organisation? Every level is a checkpoint. "We trained 200 people" is a fact about activity, not evidence that the change works. The evidence sits in the levels after it.
Leading indicators are the steps along the way that you make measurable: are people using the new system? Are they following the new way of working? Are they asking for coaching? Those figures tell you halfway through whether you are on course. If they fall, you know something is rubbing, well before the end results (lagging indicators) react. That gives you the room to adjust.
A change that measures only at the end finds out too late that adoption is not happening. Leading indicators are your waypoints. They buy you the time to adjust the approach before it is too late.
The same principle as in the readiness heatmap: red is not a verdict, it is a request for help. A falling adoption indicator is not proof that the change is wrong. It is a signal that somewhere a rung on the awareness ladder is missing, or that the capacity ceiling has been reached, or that the right voice has not been heard yet.
We build the measurement strategy on two tracks. Leading indicators (adoption, behaviour, involvement) that warn early and lay the ground for adjustment. And lagging indicators (KPIs, results, benefits) that confirm whether the change delivers what the strategic alignment map promised. The sponsors own the lagging indicators, the change manager watches the leading indicators. Read more about how we work →
The measurement strategy follows a chain: what you do (training, communication, coaching) lets people do something (skills, behaviour). What people then do differently produces results (speed, quality, cost). And those results contribute to the strategic goals of the organisation. At every link in the chain you define in advance: what do I expect to see here? At what moment? That is not reporting after the fact, it is steering on evidence.
Measuring is not about proving you were right. It is about knowing at any moment whether you are on course, and adjusting on evidence instead of on instinct. The measurement strategy you build here is the instrument that lets you tell the change dip apart from a structural problem, and that gives the steering group the information to keep supporting the change instead of adjusting in a panic.
In a conversation we help you pick the right indicators so you can adjust before it is too late.